Road resurfacing works from mid-May at Lower Kent Ridge Road

A message from the Maintenance Services Division, Office of Estate & Development explained that the electrical network upgrading project is completed and affected roads will now be resurfaced.

OED is taking this opportunity to repair and improve the conditions of the roads that are shown in the map below.

NUS-Road Resurface Route-A

Road resurfacing works will be carried out from 11 May 2013 to 15 June 2013, from 8.00pm to 7.00am the next morning, every day of the week (including public holidays).

These roads will remain accessible by motorists as the contractor will work on a single lane of the two-lane road at any one time before progressing to adjacent lane.

Signages and road marshallers will guide motorists in the affected locations.

If there are issues during the period, let OED know through their 24/7 Maintenance Hotline (6516-1515) or email oedhelp@nus.edu.sg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s